Skip to main content

“I am a Canadian, free to speak without fear, free to worship in my own way, free to stand for what I think right, free to oppose what I believe wrong, or free to choose those who shall govern my country. This heritage of freedom I pledge to uphold for myself and all mankind.” ~~ John G. Diefenbaker

NDP COVER-UP: Ministry Hid Nanaimo Rail Safety Defects Despite Major Risk of Catastrophic Public Safety Incident

Internal regulatory records show that the Ministry of Transportation and Infrastructure knew about severe and dangerous defects on the nine-mile rail line, between Wellcox Yard and Superior Propane in Nanaimo, and failed to act. 

Inspectors documented track conditions so unsafe that the line could not reliably support the movement of dangerous goods and posed a serious risk of derailment or infrastructure failure.

“This is a failure of transportation oversight, plain and simple,” said Harman Bhangu, Critic for Transportation. 

“When inspectors identify serious rail safety defects, the government’s responsibility is to stop operations and fix the problem. Allowing unsafe track to remain in service is an unacceptable breakdown of regulatory responsibility.”

Rather than shutting down unsafe operations, officials reportedly suppressed safety findings, imposed sweeping non-disclosure agreements, and allowed propane tank cars carrying up to 131,000 litres to continue moving over track that did not meet minimum safety standards. Taken together, these actions point to an egregious NDP cover-up, concealing safety failures instead of correcting them.

“The risk of a catastrophic public safety event is real,” said Sheldon Clare, Critic for Emergency Management. 

“A derailment involving hazardous materials is not a minor incident, it can mean explosions, fires, evacuations, and lives at risk. Emergency management is about preventing disasters before they happen, and in this case the government ignored clear warning signs.”

This is a public safety emergency. When serious safety concerns are identified, the priority must be preventing harm, not silencing experts. Anyone with relevant knowledge should be able to raise concerns through protected, independent channels without fear of retaliation. 

The NDP government must immediately remove barriers that prevent safety professionals from speaking freely when public safety is at risk.

CRITICAL SAFETY FAILURES IDENTIFIED

  • Track described as in “deplorable condition”
  • Joint gaps of 3½ inches with joining bars not in place all bolts missing
  • 900+ rotten ties requiring urgent replacement
  • No maintenance records since 2019
  • Propane tankers moved over track not meeting Class 1 track standards
  • 786 separate non-compliance findings on just nine miles
  • SVI locomotives previously caused fires due to maintenance failures


SECRET REPAIR DEAL: 
TSBC, ICF, and SVI struck a quiet 3-phase repair agreement involving:

  • 5,000 ties replaced immediately (quality and completion unknown)
  • 10,000 ties to be replaced by 2027
  • Major infrastructure repairs (yard tracks, bridge, barge ramp) costing $10 million
  • No transparency, no reporting, no public accountability
  • Using gauge rods / bars lieu of ties


MASSIVE FUNDING WITHOUT RESULTS

  • New $450,000 commuter rail study commissioned
  • Continues pattern of expensive studies instead of repairs
  • Funding cycle continues: MOT → ICF → SVI/Washington Group


This is now an NDP scandal involving public safety and suppressed evidence. The consequences could be catastrophic. 

This represents one of the most serious transportation safety failures in recent BC history and an ongoing public safety emergency that demands immediate accountability, full transparency, and an out-of-province independent inspection, with Critics Harman Bhangu and Sheldon Clare present, and a public hearing conducted with appropriate protections so safety professionals can testify freely without fear of retaliation.

Comments

Popular posts from this blog

A message from BC Conservative MLA Ward Stamer, and the Kamloops – North Thompson Riding Association

2025 was a busy first year. As a Caucus, we worked very hard to defeat Bills 14 and 15, legislation which allows the provincial government to move ahead without environmental assessments on renewable projects, and that also allows cabinet to build infrastructure projects without getting approval from local municipal governments. This is not acceptable to your BC Conservative caucus, and we will continue to press this government for open and transparent projects in the future.  Two things we had success in were having the first Private Members bill passed in over 40 years. The first was Jody Toors Prenatal and Post Natal Care bill, and then there was my private members Bill M217 Mandatory Dashcams in commercial vehicles (passed second reading unanimously and is heading to Committee in February). Regrettably, much of the legislation passed by the government was little more than housekeeping bills, or opportunities to strengthen the ability of Cabinet Ministers to bypass the BC legi...

BC’s Forestry Decline Is a Policy Failure, Not a Market Reality -- Forestry Critic Calls for Accountability and Urgent Policy Reset

Conservative Party of BC Forestry Critic, and Kamloops - North Thompson MLA,  Ward Stamer As the Truck Loggers Association convention begins today, BC Conservative Forestry Critic Ward Stamer says British Columbia’s forestry crisis is the result of government mismanagement, not market forces, and that an urgent policy reset is needed to restore certainty, sustainability, and accountability. “For generations, forestry supported families and communities across BC,” said Stamer.  “Today, mills are closing, contractors are parking equipment, and families are being forced to leave home, not because the resource is gone, but because policy has failed.” Government data shows timber shipment values dropped by more than half a billion dollars in the past year, with harvest levels falling by roughly 50 per cent in just four years. At the same time, prolonged permitting timelines, unreliable fibre access, outdated forest inventories, and rising costs have made long-term planning impossib...

Wildfire waste plan torched -- Forestry critic Stamer calls BC's wildfire salvage rate 'a failure'

Claims that BC is making progress salvaging wildfire-damaged timber are masking deeper problems in the forest sector, the province’s forestry critic says. Last week, BC’s Ministry of Forests said mills in the province processed more than one million cubic metres of wildfire chips in 2024-25, up from 500,000 cubic metres in 2023 and representing about seven per cent of all processed wood. Kamloops-North Thompson BC Conservative MLA Ward Stamer said those claims of progress ignore the reality that only a fraction of burned timber is being used ... CLICK HERE for the full story

Labels

Show more